SECTOR DETERMINATION DOMAIN · ENERGY INFRASTRUCTURE
GRID STATE IS NOT EXECUTION AUTHORITY.
Evaluates encoded grid, metering, provenance, infrastructure and regulatory conditions for a defined energy action. It neither operates the grid nor grants operational authority.
DOMAIN_DETERMINATION_ONLY = true · EXECUTION_AUTHORITY = false · EXECUTION_PERMISSION = false

CONTROLLED KEY VISUAL · ENERGY & ESG
BOUNDARIES
Determination yes. Authorization no.
CAN
- deterministically evaluate encoded domain conditions
- surface missing or conflicting dependencies
- provide results as state-bound evidence
CANNOT
- create external authority
- replace competent authorities, auditors, grid operators or governance roles
- independently create an Execution Right or Capability
EXECUTION RIGHTS
A gate result is only one part of the authorizable state.
AUTHORITYVALID / ABSENT
RULEVALID / ABSENT
JURISDICTIONVALID / ABSENT
TIMEVALID / ABSENT
DEPENDENCYVALID / ABSENT
ALL FIVE REQUIRED DIMENSIONS VALID → VALID EXECUTION RIGHT · ANY REQUIRED DIMENSION ABSENT → NO VALID EXECUTION RIGHT → NO CAPABILITY → NO EXECUTION