gateHeavyIndustry
gateHeavyIndustry determines encoded heavy-industry conditions for a defined action. It is a Determination Domain — not a permit authority, not an environmental regulator and not Execution Permission.

The gate does not decide whether an industrial action may execute.
CAN
- determine applicable encoded industrial conditions
- compose relevant specialised gate determinations as dependencies
- surface missing permit, authority, time, material or jurisdiction evidence
- produce evidence input for Execution Rights resolution
CANNOT
- create governmental or regulatory authority
- issue an operating or environmental permit
- mint an ExecutionCapabilityToken on its own
- replace engineering, safety or legal assessment
The industrial state is bound to the concrete action.
Plant action & purpose
The exact operational, technical or contractual action proposed.
Permit & licence state
Existing permits, approvals, conditions and their source-bound validity.
Material & process scope
Relevant materials, classifications, process state and safety dependencies.
Environmental state
Encoded air, water, soil, waste and emissions conditions relevant to the action.
Jurisdiction & site
Applicable legal territory, plant location and cross-border dependencies.
Validity & prerequisites
Time windows, versions, prerequisite determinations and upstream evidence.
Specialised gates remain specialised.
gateHeavyIndustry does not replace these domains. It binds determinations relevant to the concrete industrial scope into a sector state that can become evidence input to Execution Rights resolution.